R-Crane

Rapid Railroad RENEWAL CRANE
Bridge and track construction

BNSF Riverside, IL

We provided four spans 66' long for the phase two bridge and supplied four spans 66' long for the phase three bridge over the Des Plaines River in Riverside, Illinois. This project was the first to utilize post-tensioned concrete BTI BRIDGE GIRDERS.

Rside1a.jpg (43141 bytes) Rside2.jpg (121447 bytes) Rside3.jpg (123819 bytes)

 

Rcrane in RT&S Magazine Rcrane Ad in RT&S Magazine email Rcrane